Pictures of the SRIF-3 upgrade
The original Jupiter A, B, C and D before the SRIF-III upgrade.
Power cabling work in progress.
Every master node and storage node to have redundant power available.
One power supply is protected by a room-based UPS, the other power supply is backed up by the generator.
Installing the power ready for the Panasas storage.
Building the new wall for the cluster's larger machine-room.
The original wall is on the left.
The new wall is going up on the right.
Plastic dustsheet on the right while the original wall is removed.
Cluster machine-room refurbishment in full swing.
New: wall (to left of picture), raised floor, power, aircon, ceiling.
Panasas installation showing the the underfloor 16 Amp commando sockets.
Dual power feeds - 1 from room UPS, 1 from generator backed mains.
Pre-historic earth.
Rear view of the Panasas storage.
Each shelf has redundant power supplies and 4 x 1Gb Ethernet ports.
1st delivery of the SRIF-III cluster.
Installing the new SRIF-III cluster.